Central Electrical & Mechanical was contracted by Cosentino Group to renew the lighting throughout its industrial warehouse, which stores large slabs of stone and granite used in the manufacture of kitchen worktops and other architectural surfaces.

One of the main challenges was carrying out the lighting replacement without moving the heavy stone products stored beneath the existing fittings. Another contractor had advised that the stock would need to be relocated, creating significant cost and disruption to the business.

Central developed an alternative solution by erecting a scaffold on top of the warehouse’s existing crane system, allowing engineers to access the lighting safely without disturbing the stored materials. This approach minimised disruption and provided a more practical solution for the client.

How can we help you?

Arrange a call using the form below

    Electrical Works

    • Renewal of the existing warehouse lighting installation
    • Removal and replacement of existing lighting throughout the warehouse
    • Installation of new lighting to improve illumination across the storage areas
    • Access to high-level lighting using a scaffold erected on the existing in-house crane system
    • Planning of the lighting works around the large stone and granite slabs stored beneath the existing fittings
    • Avoidance of unnecessary movement and relocation of heavy stored materials
    • Coordination of the installation to minimise disruption to warehouse operations
    • Completion of the lighting replacement within the operational industrial environment
    • Inspection and testing of the completed lighting installation

     

    The Cosentino Group project demonstrates Central Electrical & Mechanical’s ability to find practical solutions to challenging industrial installations. By developing an alternative access arrangement, the team completed the warehouse lighting renewal without the significant disruption and additional costs associated with moving the client’s stock. Following the successful project, Central was appointed as the main electrical contractor for the client’s subsequent installations and maintenance requirements.