Completed
8 WEEKS
We were appointed as the Main Contractor to rewire a 400 year old church in MICC Cable , we refurbished the existing lanterns to their original state and also installed new lighting to enhance the detail of the main hall ceiling section. LED colour changing lights to the ceiling area on the alter section were also installed.
The works were carried out in conjunction with the English Heritage as this was a listed Building and great care had to be taken throughout the whole installation.