University of Manchester – Kitchen Refurbishment & M&E Services Reconfiguration
Central Electrical & Mechanical was appointed to reconfigure the mechanical and electrical services throughout a University of Manchester building to accommodate the installation of new kitchen units and worktops.
Following an on-site survey of the existing electrical containment and mains distribution, it was decided that the original arrangements needed to be redesigned. The works therefore included the introduction of new electrical distribution throughout the building to support the revised kitchen layouts and associated requirements.
The project involved 39 kitchens in total, with 12 new mains distribution boards required to serve the additional electrical circuits. All works had to be completed within a restricted programme ahead of students returning for the autumn semester.