Saica Paper Mill Manchester – Heat Recovery Boiler Control Wiring
Central Electrical & Mechanical (NW) Ltd was appointed as the preferred contractor for Aalborg Engineering at the new £500 million Saica paper mill factory in Manchester. The project involved specialist electrical installation work associated with the heat recovery steam generator boiler.
Central’s electrical contract focused on installing the control wiring required for the boiler’s instruments and control panel. The wiring formed an important part of the control infrastructure, providing the connections required between the instrumentation and the associated control equipment.



