R&G Cooper Manchester

R&G Cooper Manchester – Cement Works Electrical Installation

 

Central Electrical & Mechanical provided approved electricians to work alongside R&G Cooper’s engineers on an industrial cement production project in Manchester. The electrical works formed part of the wider installation programme, with the team required to follow detailed engineering drawings and complete the installation within the agreed schedule to support the production process.

The installation involved external galvanised containment and support brackets for 415V power and control wiring, followed by the installation and termination of wiring to control panels and associated motors. The work required careful coordination with R&G Cooper’s engineers to ensure the electrical installation followed the specified drawings and equipment requirements.

How can we help you?

Arrange a call using the form below

    Electrical Works

    • Provision of approved electricians to work alongside R&G Cooper’s engineering team
    • Installation of external galvanised cable containment
    • Fabrication and installation of supporting brackets for external containment
    • Installation of containment routes for 415V power cabling
    • Installation of containment routes for control wiring
    • Installation of 415V power wiring in accordance with the project drawings
    • Installation of associated control wiring throughout the required areas
    • Following detailed engineering drawings to complete the electrical installation
    • Termination of wiring within the relevant control panels
    • Electrical connections and termination to associated motors
    • Coordination of cable routes, containment and connections with R&G Cooper’s engineers
    • Completion of the electrical works in line with the cement production programme

     

    The project demonstrates Central Electrical & Mechanical’s experience supporting industrial engineering installations, providing the electrical containment, power and control wiring required for production equipment. Working alongside R&G Cooper’s engineers, the team delivered the specified installation to support the project schedule.