C&C Catering Equipment

C&C Catering Equipment – Commercial Kitchen Electrical Installation

 

Working for C&C Catering Equipment, Central Electrical & Mechanical was appointed as the main electrical contractor on a Laing O’Rourke construction site at Connell College, located at Manchester City Stadium.

The project involved installing the electrical infrastructure required for a commercial kitchen, providing power connections for extract fans, general socket outlets and specialist catering machinery. The installation included perimeter trunking and conduit drops within the walls to serve sockets and three-phase isolators, allowing the kitchen equipment to be connected to the required electrical supplies.

How can we help you?

Arrange a call using the form below

    Electrical Works

    • Main electrical contractor for the kitchen installation on the Laing O’Rourke project
    • Installation of perimeter trunking around the kitchen area
    • Installation of conduit drops within the walls
    • Electrical connections and supplies to kitchen socket outlets
    • Installation of three-phase isolators for catering equipment
    • Electrical supplies for kitchen extract fans
    • Power installations for commercial kitchen machinery
    • Distribution of electrical services throughout the kitchen area
    • Routing of cabling through the installed trunking and conduit systems
    • Positioning of electrical outlets and isolators to serve the kitchen equipment
    • Coordination of the electrical installation with the wider construction works
    • Inspection and testing of the completed electrical installation

     

    The project highlights Central Electrical & Mechanical’s experience delivering electrical installations for specialist commercial kitchen environments. The installation provided the power infrastructure required for catering equipment, extract fans and associated services within a major construction project.