Altertherm Mercure Bristol – Air Handling Unit & Boiler Electrical Installation
Central Electrical & Mechanical worked alongside Altertherm to carry out the electrical installation associated with new air handling units and boilers at the Mercure Hotel in Bristol.
The project involved the electrical connections and control wiring required for the new equipment, including both 230V and 415V wiring. The existing Building Management System (BMS) control panels also required adaptation to accommodate the new installations.
The boilers formed part of a combined heat and power (CHP) arrangement, generating electricity to help power the hotel alongside providing its heating requirements.



