Central Electrical & Mechanical (NW) Ltd was appointed as the preferred contractor for Aalborg Engineering at the new £500 million Saica paper mill factory in Manchester. The project involved specialist electrical installation work associated with the heat recovery steam generator boiler.

Central’s electrical contract focused on installing the control wiring required for the boiler’s instruments and control panel. The wiring formed an important part of the control infrastructure, providing the connections required between the instrumentation and the associated control equipment.

How can we help you?

Arrange a call using the form below

    Electrical Works

    • Appointment as preferred electrical contractor for Aalborg Engineering
    • Electrical installation works at the new Saica paper mill factory in Manchester
    • Installation of control wiring for the heat recovery steam generator boiler
    • Installation of wiring serving the boiler instrumentation
    • Control cable installation between the relevant instruments and control panel
    • Wiring installation to support the boiler control system
    • Routing and installation of control cables within the required areas
    • Coordination of instrumentation wiring with the associated control panel requirements
    • Completion of the electrical works as part of the wider boiler installation programme

     

    The Saica Paper Mill project demonstrates Central Electrical & Mechanical’s experience working alongside specialist engineering contractors on major industrial developments. The installation of control wiring for the heat recovery steam generator boiler required an understanding of industrial instrumentation and control systems, contributing to the wider electrical package at the new manufacturing facility.