Central Electrical works involved the reconfiguration of mechanical and electrical services throughout to enable the installation of new kitchen units and worktops. Following an on-site survey of the existing electrical containment and mains distribution it was decided to redesign these works and incorporate new distribution throughout the building.
We installed power and lighting with in galvanised trunking and conduit with in the walls.
There were 39 kitchens in total with 12 mains distribution boards to install for all the new circuits which all of these works were required to be completed in the same restricted programme period owing to the impending return of students for the autumn semester.