Delta Containers – Industrial Electrical Upgrade & Extraction Installation

 

Central Electrical & Mechanical was appointed to carry out an Electrical Installation Condition Report (EICR) at Delta Containers, an industrial facility specialising in the recycling of large containers, some of which previously held chemicals. The inspection identified a number of electrical faults, particularly with existing distribution boards that were unsuitable for the environment in which they were installed.

Following the inspection, Central replaced all 18 distribution boards with IP-rated units and carried out repairs to other faults identified during the assessment. Following the successful completion of these works, the client appointed Central to undertake further improvements, including new energy-efficient high-bay lighting and an extraction system serving the machinery.

How can we help you?

Arrange a call using the form below

    Electrical Works

    • Electrical Installation Condition Report (EICR) across the Delta Containers premises
    • Inspection of existing electrical installations within the industrial recycling facility
    • Identification of electrical faults and deficiencies within the existing installation
    • Assessment of existing mains distribution boards and their suitability for the operating environment
    • Replacement of all 18 existing distribution boards
    • Installation of new IP-rated distribution boards to provide more suitable protection
    • Rectification of additional electrical faults identified during the EICR
    • Electrical modifications and improvements to address the inspection findings
    • Installation of new low-energy high-bay lighting throughout the facility
    • Upgrade of industrial lighting to improve illumination within the working areas
    • Coordination of the electrical improvements with the wider extraction installation

     

    Mechanical Works

    • Installation of new industrial extraction systems within the facility
    • Installation of large extraction fans to serve the machinery
    • Installation of associated extraction ductwork
    • Positioning and installation of extraction equipment to support the machinery
    • Integration of the extraction system within the industrial working environment
    • Coordination of the extraction installation with the wider electrical upgrade

     

    The Delta Containers project demonstrates Central Electrical & Mechanical’s ability to identify and resolve electrical issues within demanding industrial environments. Following the initial EICR and replacement of 18 distribution boards, the company was appointed to carry out further electrical and mechanical improvements, providing upgraded lighting and machinery extraction facilities.