Archive

After installing there first showroom back in 2008 we were appointed to install the new electrical installation to their new showroom in 2015 all lighting and power which was controlled via an Ipad when walking through the different themed areas so the client had total...

Central Electrical were appointed by Armitage construction and Manchester university to re-new the lighting in one of the sports halls which wasn’t as straight forward due to the engineering solutions that were implemented for the lights to be installed the opposite way to what was...

Cosentino Group is a global, Spanish, family-owned company that produces and distributes high value innovative surfaces for the world of design and architecture. We were contracted to renew all lighting to the warehouse which stores large slabs of stone and granite used for kitchen work top...

We worked with Williams Tarr Group on the new trailer park extension installing all the SWA cables to the CCTV posts and the new lighting system which is LED and is required to have a directional angle of no more than 10 degrees to avoid...

We worked with Altertherm to carry out the electrical installation of the new air handling units and boilers for the hotel this involved all the 230v and 415v control wiring and also adapting the BMS control panels, all the boilers were CHP (combined heat and...

Central electrical made safe the existing mother care unit ready for them to be re-located and then the buildings were re-furbished into 4 new units with all the facades and cladding installed with new entrance towers. We had to adapt the lightning protection and install new...

We were working with the Main Contractor on a new Fire Alarm System Installation to run in combination with the existing to all 4 floors and the basement. The specialist skills developed by our long serving and highly experienced team ensure that we are able...

Central Electrical works involved the reconfiguration of mechanical and electrical services throughout to enable the installation of new kitchen units and worktops. Following an on-site survey of the existing electrical containment and mains distribution it was decided to redesign these works and incorporate new distribution...

Central Electrical have completely rewired BMW`s show room and installed new LED lighting, this is just the first phase compleated and handed over on time. We have now started phase 2 installation of all new power lighting and fire alarms to all areas including new...