United Utilities – Pump Station Electrical Installation
Central Electrical & Mechanical was appointed as the main electrical contractor for works at a United Utilities pump station reservoir. The project involved providing the electrical infrastructure required to operate new motors, drives and turbines, with the turbines generating electricity to be fed back into the National Grid.
The installation required a range of power and control cabling, including 240V, 415V and high-voltage cables, alongside the associated control wiring. All cabling was installed within the pump house to serve the new equipment and support the operation of the facility.