United Utilities

United Utilities – Pump Station Electrical Installation

 

Central Electrical & Mechanical was appointed as the main electrical contractor for works at a United Utilities pump station reservoir. The project involved providing the electrical infrastructure required to operate new motors, drives and turbines, with the turbines generating electricity to be fed back into the National Grid.

The installation required a range of power and control cabling, including 240V, 415V and high-voltage cables, alongside the associated control wiring. All cabling was installed within the pump house to serve the new equipment and support the operation of the facility.

How can we help you?

Arrange a call using the form below

    Electrical Works

    • Appointment as main electrical contractor for the United Utilities pump station project
    • Installation of power supplies to new motors
    • Installation of electrical supplies to new drives
    • Power supply installations for the turbines
    • Electrical infrastructure to support the generation of electricity for export back into the National Grid
    • Installation of 240V electrical cabling
    • Installation of 415V power cabling
    • Installation of high-voltage cabling
    • Installation of control cables throughout the pump house
    • Routing and installation of power and control cabling within the pump house
    • Electrical connections to the new motors, drives and turbine equipment
    • Coordination of power and control wiring to serve the different items of equipment
    • Completion of the electrical installation to support the operation of the pump station

     

    The United Utilities project demonstrates Central Electrical & Mechanical’s experience delivering specialist electrical installations within the utilities sector. The works involved integrating multiple power and control requirements within a pump station environment, supporting both the operation of the equipment and the generation of electricity for the National Grid.