Altertherm Mercure Bristol – Air Handling Unit & Boiler Electrical Installation

 

Central Electrical & Mechanical worked alongside Altertherm to carry out the electrical installation associated with new air handling units and boilers at the Mercure Hotel in Bristol.

The project involved the electrical connections and control wiring required for the new equipment, including both 230V and 415V wiring. The existing Building Management System (BMS) control panels also required adaptation to accommodate the new installations.

The boilers formed part of a combined heat and power (CHP) arrangement, generating electricity to help power the hotel alongside providing its heating requirements.

How can we help you?

Arrange a call using the form below

    Electrical Works

    • Electrical installation associated with the new air handling units
    • Electrical installation associated with the new boilers
    • Installation of 230V control wiring
    • Installation of 415V control wiring
    • Control wiring connections to support the operation of the new equipment
    • Adaptation and modification of existing BMS control panels
    • Integration of the new equipment with the building management controls
    • Electrical connections associated with the combined heat and power boiler installation
    • Coordination of electrical works with Altertherm and the mechanical equipment installation
    • Inspection and testing of the completed electrical installation

     

    The Mercure Bristol project demonstrates Central Electrical & Mechanical’s experience delivering specialist electrical installation and control wiring for mechanical building services. Working alongside Altertherm, the team provided the electrical connections and BMS modifications required to integrate the new air handling units and CHP boilers into the hotel’s building services infrastructure.